???jsp.display-item.social.title??? |
|
Please use this identifier to cite or link to this item:
http://tede.upf.br:8080/jspui/handle/tede/1806
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.creator | Corazza, Cristyan Ricardo | - |
dc.creator.Lattes | http://lattes.cnpq.br/5031554140659055 | por |
dc.contributor.advisor1 | Pandolfo, Adalberto | - |
dc.contributor.advisor1Lattes | http://lattes.cnpq.br/3008487845388983 | por |
dc.date.accessioned | 2019-10-30T19:41:59Z | - |
dc.date.issued | 2019-06-28 | - |
dc.identifier.citation | CORAZZA, Cristyan Ricardo. Otimização de processos de produção em uma empresa de manutenção predial com base na produção mais limpa. 2019. 71 f. Dissertação (Mestrado em Engenharia Civil e Ambiental) - Universidade de Passo Fundo, Passo Fundo, RS, 2019. | por |
dc.identifier.uri | http://tede.upf.br:8080/jspui/handle/tede/1806 | - |
dc.description.resumo | As edificações que possuem obras com métodos convencionais de construção civil apresentam volumes expressivos de materiais sendo desperdiçados em forma de Resíduos da Construção Civil, chamados de RCC. Esses resíduos são decorrentes de processos construtivos obsoletos, falhas e desperdícios. Para mitigação dessa geração, a pesquisa tem por objetivo uma proposta da redução de geração de resíduos e do impacto ambiental em uma empresa que executa obras de manutenção e reformas nas edificações de instituições financeiras, apresentando benefícios ambientais, econômicos à empresa, através do estudo de estratégias metodológicas de Produção Mais Limpa e atendimento à Resolução CONAMA nº 307/2002. Para a obtenção destes resultados acompanhou-se o planejamento e execução das obras de construção civil, além das respectivas etapas de planejamento e execução dos serviços. O estudo identificou quais são os serviços mais relevantes usando metodologias da curva ABC de insumos. Nos serviços selecionados é apresentado através da matriz de Leopold a relevância e magnitude dos impactos ambientais. E, após realizar a elaboração de um plano de implementação de melhoria continuada dessa empresa, ele foi proposto a aplicação em seus canteiros de obra. O plano de implementação elaborado contou com uso metodologia 5W2H, de forma a facilitar o entendimento da necessidade das mudanças de matérias-primas, processos e nas rotinas do canteiro de obra realizando a aplicação das oportunidades destacadas. As opções de melhoria apresentadas revelaram que para reduzir os resíduos e maximizar os ganhos econômicos, não são necessários investimentos elevados, tais como: substituição de matérias primas, capacitação técnica, implementação de planejamentos eficientes. Portanto pode ser evidenciado adaptações pontuais nos serviços já consolidados. | por |
dc.description.abstract | As the buildings that have been used are under construction, expressive volumes of materials are being wasted in the form of Civil Construction Waste, called RCC. These are the processes of obsolete, flawed and wasteful. The present study aimed to reduce the generation of waste and environmental impact in companies that have maintenance and maintenance works. Metallic Finances of Production More CONAMA nº 307/2002. For the monitoring of results, the monitoring and execution of the civil construction works, besides the stages of planning and execution of the services. The study identified which are the most relevant services using the frameworks of ABC inputs. In the services being selected through Leopold's matrix the relevance and magnitude of the environmental impacts. And after realizing an elaboration of an implementation plan of continuous improvement, the company was applied in an application in its construction sites. The elaborated implementation plan was a process of decision making on the changes of performance, processes and routines of the construction site realizing an investment of the outstanding opportunities. As development options, those that have become tougher and more advantageous have been improved, such as: replacement of primary ingredients, technical training, and implementation of efficient planning. Clearly, it is possible to adapt ad hoc adaptations to already consolidated services. | eng |
dc.description.provenance | Submitted by Aline Rezende (alinerezende@upf.br) on 2019-10-30T19:41:59Z No. of bitstreams: 1 2019CristyanRicardoCorazza.pdf: 4744233 bytes, checksum: 6121815c0293bc39d5e25b37c79242ba (MD5) | eng |
dc.description.provenance | Made available in DSpace on 2019-10-30T19:41:59Z (GMT). No. of bitstreams: 1 2019CristyanRicardoCorazza.pdf: 4744233 bytes, checksum: 6121815c0293bc39d5e25b37c79242ba (MD5) Previous issue date: 2019-06-28 | eng |
dc.format | application/pdf | * |
dc.language | por | por |
dc.publisher | Universidade de Passo Fundo | por |
dc.publisher.department | Faculdade de Engenharia e Arquitetura – FEAR | por |
dc.publisher.country | Brasil | por |
dc.publisher.initials | UPF | por |
dc.publisher.program | Programa de Pós-Graduação em Engenharia Civil e Ambiental | por |
dc.rights | Acesso Aberto | por |
dc.subject | Construção civil | por |
dc.subject | Sustentabilidade | por |
dc.subject | Redução de resíduos | por |
dc.subject | Reaproveitamento (Sobras, refugos, etc.) | por |
dc.subject.cnpq | ENGENHARIAS::ENGENHARIA CIVIL | por |
dc.title | Otimização de processos de produção em uma empresa de manutenção predial com base na produção mais limpa | por |
dc.title.alternative | Production process optimization in a building maintenance company based on cleaner production | eng |
dc.type | Dissertação | por |
Appears in Collections: | Programa de Pós-Graduação em Engenharia Civil e Ambiental |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
2019CristyanRicardoCorazza.pdf | Dissertação Cristyan Ricardo Corazza | 4.63 MB | Adobe PDF | View/Open ???org.dspace.app.webui.jsptag.ItemTag.preview??? |
Items in TEDE are protected by copyright, with all rights reserved, unless otherwise indicated.