???jsp.display-item.social.title??? |
|
Please use this identifier to cite or link to this item:
http://tede.upf.br:8080/jspui/handle/tede/1628
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.creator | Roth, Alencar Silveira | - |
dc.creator.Lattes | 00350698058 | por |
dc.contributor.advisor1 | Souza, Jocarly Patrocínio de | - |
dc.contributor.advisor1Lattes | http://lattes.cnpq.br/6186485028623188 | por |
dc.date.accessioned | 2019-03-14T00:01:24Z | - |
dc.date.issued | 2015-10-24 | - |
dc.identifier.citation | ROTH, Alencar Silveira. Projeto elétrico modular para construção de ônibus urbanos: estudo de caso. 2015. 103 f. Dissertação (Mestrado em Projeto e Processos de Fabricação) - Universidade de Passo Fundo, Passo Fundo, RS, 2015. | por |
dc.identifier.uri | http://tede.upf.br/jspui/handle/tede/1628 | - |
dc.description.resumo | O mercado de atuação das principais empresas brasileiras fabricantes de ônibus possui a característica de personalizar seus produtos de acordo com as necessidades de seus clientes. Esta prática acaba gerando diversos problemas no processo produtivo, dentro deles, a diversidade de sistemas elétricos dos ônibus. Para resolver estas dificuldades do sistema produtivo, as empresas estão investindo em novas tecnologias de software, projeto e processos de fabricação. Este trabalho apresenta um novo procedimento de projeto, fabricação e processo de montagem do sistema elétrico de suas carrocerias de ônibus urbanos, utilizando soluções de projetos modulares, explorando as características globais do sistema elétrico, para obter um processo de fabricação adequado às suas necessidades produtivas de larga escala, sem influenciar na caracterização individual do produto de cada cliente. O novo processo fabril da carroceria apresenta nos seus resultados melhorias significativas nos projetos de engenharia, como precisão e tempo de projeto, redução de custo de fabricação e facilidade de manutenção das redes elétricas. | por |
dc.description.abstract | The operation market of the leading manufacturers Brazilian bus companies, has the caracteristic to customize your product according to the needs of its customers. This practice ends up causing many problems in the production process of the company, among them, the diversity in the electrical system of the bus. To solve these drawbacks productive, companies are investing in new software technologies, project, and manufacturing processes. This work presents a new methodology for design, fabrication, and assembly process of the electricalsystem of their product line for urban buses using modular designs solutions, exploring the global characteristics of the electrical system, for obtain a suitable manufacturing process their production needs of large scale, without influencing individual characterization of the product of each client. The new manufacturing process of the product presents in its results, significant improvements in engineering projects, how precision and time of project, manufacturing cost reduction and ease of maintenance of electrical networks. | eng |
dc.description.provenance | Submitted by Mariana Freitas (marianafreitas@upf.br) on 2019-03-14T00:01:24Z No. of bitstreams: 1 2015AlencarRoth.pdf: 2751531 bytes, checksum: 3494b418302c4511aed7a7a06ecd2c0a (MD5) | eng |
dc.description.provenance | Made available in DSpace on 2019-03-14T00:01:24Z (GMT). No. of bitstreams: 1 2015AlencarRoth.pdf: 2751531 bytes, checksum: 3494b418302c4511aed7a7a06ecd2c0a (MD5) Previous issue date: 2015-10-24 | eng |
dc.format | application/pdf | * |
dc.language | por | por |
dc.publisher | Universidade de Passo Fundo | por |
dc.publisher.department | Faculdade de Engenharia e Arquitetura – FEAR | por |
dc.publisher.country | Brasil | por |
dc.publisher.initials | UPF | por |
dc.publisher.program | Programa de Pós-Graduação em Projeto e Processos de Fabricação | por |
dc.rights | Acesso Aberto | por |
dc.subject | Processos de fabricação | por |
dc.subject | Redes elétricas | por |
dc.subject | Análise | por |
dc.subject | Ônibus | por |
dc.subject | Projetos e construção | por |
dc.subject | Mecânica | por |
dc.subject.cnpq | ENGENHARIAS::ENGENHARIA MECANICA | por |
dc.title | Projeto elétrico modular para construção de ônibus urbanos: estudo de caso | por |
dc.title.alternative | Modular electric design for urban bus construction: a case study | eng |
dc.type | Dissertação | por |
Appears in Collections: | Programa de Pós-Graduação em Projeto e Processos de Fabricação |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
2015AlencarRoth.pdf | Dissertação Alencar Silveira Roth | 2.69 MB | Adobe PDF | View/Open ???org.dspace.app.webui.jsptag.ItemTag.preview??? |
Items in TEDE are protected by copyright, with all rights reserved, unless otherwise indicated.